ノアの箱舟を創ろう Let us Create the Super Ocean-Floating-Structures such as the Noah's ark.

ノアの箱舟を創ろう Let us Create the Super Ocean - Floating - Structures such as the Noah's ark.

Tuesday, October 2, 2012

From: http://www.4coffshore.com/windfarms/Able-Humber-Port-pid50.html
Able Humber Port
Satellite View Of Able Humber Port. (Marker located on AMEP site)

About Able Humber Port
*** This site has recently been granted Enterprise Zone status ***

Able Marine Energy Park is a new port being developed (AMEP - southern red boundary zone on above image) offering 325 ha (803 acres) of developable land and 1500m of new deep water quays, designed specifically for the offshore wind sector. AMEP offers extensive land availability for investors to optimise their plant layout and to expand in phases as and when required. Logistics savings will be maximised through the co-location of suppliers: Blades, Towers and potentially the manufacturers of Foundations (Monopiles, Jackets and GBS structures) as well as key sub suppliers e.g. convertors, gearboxes, generators, and nacelle canopies.

Able Logistics Park (ALP - see northern red boundary zone on above image) offers a further 270 ha (667 acres) of warehousing and external storage along with a purpose built Business Park providing office facilities for engineers, consultants, OEMs, supply chain companies, developers and associated businesses. AMEP will service the needs of the Renewable Energy Sector providing a base for manufacture, storage, assembly and deployment of next generation offshore wind turbines (OWTs) and their associated supply chain(s).

AMEP benefits from the following:
•The UKs largest Enterprise Zone
•Full Enhanced Capital allowances
•Super-Fast Broadband priority
•Special Planning Zone – to expedite planning
•Business Rate Relief
•A Centre for Renewable Offshore Engineering – Identified by UK Government
•DECCs Offshore Wind Ports Infrastructure Fund – The site is suitable for applications to this fund

Location and Contact Details for Able Humber Port

Port Name
Able Humber Port
Country
United Kingdom
Port Owner
Able Humber Ports Ltd

Port Address
Rosper Road, North Killingholme, North Lincolnshire DN40 3DZ

Contact David Shepherd, Able House, Billingham Reach Industrial Estate, Billingham, Teesside TS23 1PX

Contact Telephone
+44 (0)1642-806080

Contact Fax
+44 (0)1642-655655

Email
dshepherd@ableuk.com or info@ahpl.com

Website
Visit the website for Able Humber Port

Coordinates (decimal degrees)
53.656° Lat, -0.244° Lon
Access Details for Able Humber Port

Port Depth
11 metres

Entrance Width
840 metres

Tidal Range (Springs)
6.4 metres


Maximum Vessel Size
LOA : any
Draught : 11 m
Beam : any
Tug Assistance Available?
Yes

Piloting Information
Exemption certificates can be granted for vessels above 90m. Pilotage is not required for vessels under 90m.

Turning Area Available?
Yes

Rail Links
Yes (direct access to national network and Tata Steel Plant, Scunthorpe)

Major Roads
•M180 10 miles from AHP
•M18 35 miles from AHP
•M62 42 miles from AHP
•M1 55 miles from AHP

Private Internal Road Links
Yes

Distance to Helipad
14.5 km
Distance to International Airport
14.5 km

Any Comments
Quays can be designed to provide -23.4m water depth (at MHWS).
International Airports: •Humberside Distance 14 km (15 minutes)
•Doncaster Distance 72 km (45 minutes)
•Leeds Distance 134 km (1.4 hours)
•Manchester Distance 196 km (2 hours)
•Birmingham Distance 217 km (2.1 hours)

Heliports:
Humberside Airport operates the UK’s 2nd largest Heliport.
Contact us to add your PortCapacities at Able Humber Port

Number Of Cranes
4

Crane Comments
2 x 250 tonne (lift capacity). 2 crawler cranes 1x1250 tonne (lift capacity) and 1x1600 tonne (lift capacity).

Quay Length
1,279 metres

Quay Loading Capacity
20 tonnes/m2 (Heavy load out area 40 tonnes/m2)

Quay Comments
Quay length: 1279m. Quays loads: 20 t/m2 UDL with patch loads up to 100 t/m2. Multi-user, designed specifically around the needs of the OWT industry.

Storage Space Available
647 hectares (6,474,970 m2 or 1,600 acres)

Storage Comments
Quay land storage is available

Development Land Available
647 hectares (6,474,970 m2 or 1,600 acres)

Development Land Comments
Supply Chain Capabilities and Services

Suitable Installations Base?
Yes

Suitable Operations and Maintenance Base?
Yes

Can support manufacturing of ..?
Towers : Yes Blades : Yes Foundations : Yes Cables : Yes Supplies ..? Provisions : Yes Water : Yes Fuel Oil : Yes Diesel Oil : Yes

Services
Repair, loading / unloading, decommissioning / recycling, multi-user. All supplies can be delivered by road, rail and sea.

Has Dry Dock?
No

Has Warehousing?
Yes

Security Level
TRANSEC

Additional Information & Experience
Buildings are available from 2012 with the quays becoming available late 2014.

Able is an experienced operator of multi-user port facilities and has a substantial track record of developing sites and managing large industrial based projects

If you require quay access before late 2014 please contact us to enquire about our Able Seaton Port facility.

© 2012, 4C Offshore

Tuesday, September 4, 2012

RWE Innogy: Errichtung des Offshore-Windparks Rhyl Flats

RWE Innogy: Errichtung des Offshore-Windparks Rhyl Flats RWEKonzernさんが 2010/04/12 にアップロード Seit über 10 Jahren betreibt RWE Windparks in ganz Europa. Großes Potenzial bieten Windparks auf dem offenen Meer, sogenannte Offshore-Windparks. Diese Anlagen fernab von Siedlungsgebieten erzeugen mehr Strom als Anlagen an Land, da auf hoher See die Winde stärker und gleichmäßiger wehen. (Film nur in englischer Version) カテゴリ:科学と技術

==============================================================

E.ON Climate & Renewables Eonさんが 2010/03/30 にアップロード E.ON Climate & Renewables. An overview of our most important projects - from offshore wind to solar power. カテゴリ: 科学と技術

==============================================================

洋上風力発電所の再生可能エネルギー InfineonJPさんが 2012/05/07 に公開 http://www.infineon.com/energy-efficiency - エネルギーは生活そのものです。家の暖房や車の駆動に加え、巨大都市に明かりを灯します。エネルギーに対する世界的な需要は増え続ける一方で、資源は減少しています。世界­中で消費されるエネルギーの3分の1は電気で、その傾向はさらに強まっています。将来、エネルギー源の鍵となるのがエネルギー効率です。 電気の最適な使用は、スマートな半導体技術を利用することで実現します。革新的なチップソリューションによって車、産業用プラント、民生用家電の微調整を行い、エネルギー­を抑えます。スマートメーターによってkWhの電力量を分単位の精度で評価できるようになり、電力節減が促されます。 風力エネルギーの未来は、世界中の沖合地域に見ることができます。北海やバルト海だけを見ても、今後2-3年で30もの洋上風力発電所が計画されています。 未来の電力供給網 はより効率的になります。 未来の電力供給網では、風力、太陽熱、水力を使って地元で電力を自給自足します。しかし、浮き沈みがあるのは避けられません。 スマートグリッドは、電力の供給や需要を制御することで、信頼性の高い電流の流れを確保します。 インフィニオンの革新的な半導体ソリューションを採用することで、コンセントからの電力の損失が低減されます。 パワーエレクトロニクスにより、発電所から何千キロも離れた消費者へ効率よくエネルギーが送られます。 カテゴリ: 科学と技術

Translate